During this period, considerable construction noise is to be expected and access to the paths between the ZMK, Audimax, Computer Science and Mathematics buildings and the refectory will be limited.
Specifically (please also refer to the site plan):
- The main path between the Art Education and Audimax buildings will be narrowed to a width of approx. 1.3 metres, but will remain accessible on foot.
- The narrow footpath leading from the Audimax building to the Inn river (passing under the pedestrian bridge) will be closed.
- The ZMK and the forecourt between the Audimax Building and the refectory will not be accessible by vehicle during the construction work.
- The parking spaces for scooters will be closed.
The bicycle parking spaces in front of the Computer Science and Mathematics building and the pedestrian bridge between the ZMK and the forecourt between the Audimax and the refectory ("FIM Bridge") will remain open.
We ask for your understanding that the construction work cannot be postponed due to the approaching cold season and the significant additional costs associated with operating the temporary heating in the refectory building.